“Tommy and his team were excellent workers, they replaced my flat roof on my extension, removed spray foam from my loft, and replaced my roof with a new one, also releaded a chimney and removed a chimney. Very friendly team, cleaned up after themselves every day.”
New roofs and re-roofs in Ipswich and across Suffolk
Full strip-and-relay in clay, concrete or natural slate, with the structure checked before anything goes back on.
Free new roofs quote
One tap, then a name and number. Tom calls you back within 1 working hour, Mon to Sat.
Tom calls you back himself. Not a call centre, not a sales rep. Usually within 1 working hour, Mon to Sat.
- Free survey with photographs, fixed written quote, no day rates
- Written workmanship guarantee plus the manufacturer warranty
New roofs and full re-roofs across Ipswich, Suffolk and the Essex border in clay, concrete and natural slate, with the structure inspected and the ventilation specified deliberately rather than assumed.
A re-roof is the one time in fifty years that the structure is visible. Stripping the covering and putting a new one straight back on without checking what is underneath wastes that opportunity, and it is the reason some new roofs sag within a decade.
The work
What new roofs covers
- Full strip and relayExisting covering, battens and underlay off, structure inspected, new breathable membrane, new treated battens to the correct gauge, new covering. Anything less is a recover, and a recover on tired battens is a false economy.
- Clay plain tiles and pantilesHand-made and machine-made clay, matched to the existing where the property is period or in a conservation area. Clay weathers rather than fades, which is why it still looks right on a Suffolk roof at 80 years old.
- Concrete interlocking tilesThe cost-effective choice on post-war and modern stock. Fewer tiles per square metre, faster to lay, and a realistic 50-year life if the fixings and the underlay are right.
- Natural slateWelsh and Spanish slate, hand-cut and holed on site where a like-for-like match is needed. Graduated courses on period work where the original was graduated.
- Structural workRafter and purlin repairs, sistering, new wall plates, and replacement of anything the previous covering was hiding. Priced separately and only where the survey shows it is needed.
- Dry-fix throughoutMechanically fixed and ventilated ridge, hip and verge as standard. Mortar bedding on new work is a warranty claim waiting to happen.
How we quote and how we work
We survey from inside the loft as well as from outside, because the roof structure tells you more than the covering does. The quote is itemised: scaffold, strip and disposal, structural repairs if any, membrane and battens, covering, dry-fix components, leadwork, and making good. You can see exactly what each part costs, and nothing appears halfway through as an extra.
Where this work goes wrong
Ventilation is where most new roofs are quietly compromised. A breathable membrane is not a substitute for eaves and ridge ventilation on every build-up, and sealing a roof tight without a path for moisture is how you get condensation dripping onto new insulation. We specify the ventilation as deliberately as we specify the tile.
What moves the price. The three things that move a re-roof price are scaffold, the covering you choose, and what the strip reveals. We give you a fixed price for the first two and an honest, itemised range for the third, agreed with you before anyone touches it.
Our own photographs
Recent new roofs work
By town
New Roofs where you are
What this work looks like on the building stock in each town we cover.
New Roofs in Ipswich
What an Ipswich strip turns up
IP1-IP9 →New Roofs in Felixstowe
Fixing specification for a Felixstowe re-roof
IP11 →New Roofs in Woodbridge
Consent, matching and access in Woodbridge
IP12-IP13 →New Roofs in Stowmarket
Whole streets in Stowmarket are ageing together
IP14 →New Roofs in Colchester
Planning and party walls on a Colchester re-roof
CO1-CO7 →New Roofs in Newmarket
Planning a re-roof on a Newmarket property
CB8 →New Roofs in Gislingham
Scaffold, lanes and pantile matching around Gislingham
IP23 →New Roofs in Bury St Edmunds
Consent, access and wind on a Bury St Edmunds re-roof
IP28-IP33 →How much will a new roof cost?
Build it in our price builder and see your range in 60 seconds.
24 hours, 7 days
24-hour emergency roofer across Suffolk
Active leak or storm damage right now? A roofer answers the phone, seven days a week, and you get a realistic arrival time rather than an optimistic one.
Verified reviews
Rated 9.71 out of 10 on Checkatrade and 5.0 on Google
Every review below is reproduced word for word from the Checkatrade profile. Nothing is written by us.
“Within 3 days I had a new dry ridge system installed and a new tiled porch roof. I am very pleased with the work. The team were very professional, very friendly and explained how they planned to complete the work.”
“Responded quickly to my request, arrived to fix the problem early morning the day after my request. Dealt with it quickly and efficiently.”
Work booked through Checkatrade is backed by their £1,000 guarantee, T&Cs apply. See all 23 reviews.
A full re-roof, step by step
- Survey inside and out. Loft first, because the rafters, purlins and wall plates tell us more than the tiles. Then the covering, chimneys, valleys and roofline.
- Itemised quote and covering choice. Scaffold, strip and disposal, membrane and battens, covering, dry-fix, leadwork and making good, each priced. You choose the covering with samples in hand.
- Scaffold and strip. Scaffold up with edge protection, old covering and battens off in sections so the house is never left open overnight.
- Structural check and repairs. With the roof open we check every rafter. Anything defective is shown to you in photographs and repaired before we go on.
- Membrane, battens and covering. New breathable membrane, treated battens set out to the correct gauge, ventilation at eaves and ridge, then the covering laid and fixed.
- Dry-fix, lead and roofline. Mechanically fixed ridge, hips and verges, new leadwork at chimneys and abutments, and roofline replaced at the same time if it is due.
- Handover. Scaffold down, site cleared, photographs of every stage and the written guarantee with the invoice.
Signs it is time for a new roof rather than another repair
- Repairs are coming round every winter in different places.
- The underlay crumbles when touched or is missing in places from the loft.
- Concrete tiles are flaking or delaminating across the whole slope.
- The roof line dips or sags between the rafters.
- Several neighbours with the same age of house have already re-roofed.
Coverings and what they suit
Clay plain tiles and pantiles suit period and conservation property and weather well rather than fading. Concrete interlocking tiles are the cost-effective choice on post-war and modern houses. Natural slate gives the longest life and is matched course for course on Victorian terraces. We will tell you if your planning authority or a conservation area limits the choice.
How long a re-roof takes
A typical semi-detached or terraced re-roof is around a week of working days on the roof, plus scaffold either side. Larger or more complex roofs, structural repairs and bad weather extend that, and we tell you the expected length at quote stage and keep you updated if the forecast changes it.
What affects the price of a new roof
Scaffold, the covering you choose and what the strip reveals underneath are the three big factors. Chimneys, valleys, dormers and roofline add to it. The roof replacement cost guide gives realistic ranges by house type, and the survey turns it into a fixed, itemised price.
Aftercare
A new roof needs very little. Keep gutters clear, keep trees cut back from the slopes, and have the roof looked at after a severe storm. Manufacturer warranties on the tiles and membrane sit alongside our workmanship guarantee, and we give you the paperwork for both.
A recent job like this

See more of our work in the gallery.
Related services
Roof repairs · Fascias and soffits · Roof replacement costs · New roofs in Ipswich · New roofs in Woodbridge · New roofs in Colchester
No small print games
What you actually get in writing
Most roofers say "guaranteed" and leave it there. Here is exactly what ours covers, and exactly what it does not, before you commit to anything.
- Issued with your invoice, not promised on the phone
- Before and after photographs of your roof included
- Manufacturer warranty on the materials, on top of ours
Written workmanship guarantee
Stormproof Roofing (Cambs) Ltd. · trading since 2020
- What is covered
- Our workmanship on everything we install, for the term stated on your invoice.
- On top of that
- The manufacturer's own warranty on the tiles, membrane, dry-fix components and membranes used.
- Booked through Checkatrade
- Also covered by Checkatrade's £1,000 guarantee, T&Cs apply.
- What voids it
- Storm damage beyond the design load, third-party work on the same roof afterwards, and failure to clear gutters.
- In writing
- Issued with the invoice, alongside the before and after photographs of your roof.
Straight answers
New Roofs: common questions
How long does a full re-roof take?
A typical semi-detached is four to seven working days once scaffold is up, weather permitting. Larger period properties with complex leadwork run longer, and we give you the programme in writing before we start.
What happens if it rains mid-job?
We only ever strip what we can make watertight the same day, and the roof is sheeted overnight. That is why we work in sections rather than stripping the whole roof on day one.
Do I need planning permission for a new roof?
Like-for-like replacement is permitted development. A Listed building, a conservation area, or a change of material or roof line needs consent, and we will tell you which applies before you commit.
Is the new roof guaranteed?
Yes. A written workmanship guarantee from us, plus the manufacturer's warranty on the tiles, membrane and dry-fix components.
Can you re-roof with solar panels already on the roof?
Yes. On Humber Doucy Lane in Ipswich we removed every panel, stripped and relaid the roof, then reinstalled and recommissioned the whole array on the new covering. Tell us about any panels at quote stage so the removal and refit are priced in.
Do we need to move out during a re-roof?
No. The house stays lived in. We strip in sections so the roof is never left open overnight, and the scaffold has a protected walkway at the door. The loft is the only area we ask you to keep clear.
Free, no obligation
Get a straight answer on your roof
Tell us what is going on. Tom calls you back within 1 working hour, Mon to Sat with honest advice and a fixed written quote. If it is a five-minute fix he will tell you that too.
- Free survey with photographs of what we find
- Fixed written price, never a day rate
- No sales visit, no finance pitch, no hard sell
Prefer to talk? 01473 974920 · 24-hour emergency line, seven days a week.
Get your free roofing quote
Two taps and a phone number. That is the whole form.
Tom calls you back himself. Not a call centre, not a sales rep. Usually within 1 working hour, Mon to Sat.
9.71/10