“Tommy and his team were excellent workers, they replaced my flat roof on my extension, removed spray foam from my loft, and replaced my roof with a new one, also releaded a chimney and removed a chimney. Very friendly team, cleaned up after themselves every day.”
New Roofs in Gislingham
Hand-made clay pantile is the default on new roofs in Gislingham and across the wider IP23 lanes.
Free new roofs quote in Gislingham
One tap, then a name and number. Tom calls you back within 1 working hour, Mon to Sat.
Tom calls you back himself. Not a call centre, not a sales rep. Usually within 1 working hour, Mon to Sat.
- Gislingham and the wider IP23 lanes are roughly 35 minutes from the Ipswich base, inside the same-day survey area. On a storm night, rural access and unlit lanes mean we will give you a realistic time rather than an optimistic one.
- Fixed written quotes, free survey with photographs of what we find
- Google Guaranteed · Checkatrade 9.88 · Expert Roofer verified
Hand-made clay pantile is the default on new roofs in Gislingham and across the wider IP23 lanes. The period cottages on The Street and Mill Street were laid on original battens that meet no modern gauge, and some carry a 1970s thatch-to-tile conversion done without the structure being upgraded for the extra weight. Take the covering off one of those and you are looking at rafter and wall plate work before a single new tile goes back. The Victorian and Edwardian semis in the village centre are slate with tired nails and lead valleys patched rather than replaced. Scattered through IP23 there is post-war infill on concrete tile at end of life, and around it barns in profiled sheet and asbestos cement that needs licensed handling.
IP23 · Suffolk
New Roofs & Re-Roofs we carry out in Gislingham
A re-roof is the one time in fifty years that the structure is visible. Stripping the covering and putting a new one straight back on without checking what is underneath wastes that opportunity, and it is the reason some new roofs sag within a decade.
- Full strip and relayExisting covering, battens and underlay off, structure inspected, new breathable membrane, new treated battens to the correct gauge, new covering. Anything less is a recover, and a recover on tired battens is a false economy.
- Clay plain tiles and pantilesHand-made and machine-made clay, matched to the existing where the property is period or in a conservation area. Clay weathers rather than fades, which is why it still looks right on a Suffolk roof at 80 years old.
- Concrete interlocking tilesThe cost-effective choice on post-war and modern stock. Fewer tiles per square metre, faster to lay, and a realistic 50-year life if the fixings and the underlay are right.
- Natural slateWelsh and Spanish slate, hand-cut and holed on site where a like-for-like match is needed. Graduated courses on period work where the original was graduated.
- Structural workRafter and purlin repairs, sistering, new wall plates, and replacement of anything the previous covering was hiding. Priced separately and only where the survey shows it is needed.
- Dry-fix throughoutMechanically fixed and ventilated ridge, hip and verge as standard. Mortar bedding on new work is a warranty claim waiting to happen.
Scaffold, lanes and pantile matching around Gislingham
Mid Suffolk District Council is the planning authority, and several of the IP23 villages have conservation areas with a high density of Listed cottages inside them. Pantile matching is usually a condition rather than a suggestion, so the first job is establishing whether the roof you have is hand-made or machine-made clay, and sourcing to that rather than to the nearest stock item. The lanes are the practical constraint. A scaffold wagon and a tile delivery both need a lane wide enough to turn in and firm ground to unload onto, and on a wet week a verge that looked fine in July will not carry the weight. We check that at survey rather than on the morning. Exposure is the part people underestimate: flat arable on every side means gable ends, verges and barn ridges take loading closer to a coastal roof than a sheltered village one, so mechanical fixing and a full clip pattern are the specification, not the upgrade.
How we quote and how we work
We survey from inside the loft as well as from outside, because the roof structure tells you more than the covering does. The quote is itemised: scaffold, strip and disposal, structural repairs if any, membrane and battens, covering, dry-fix components, leadwork, and making good. You can see exactly what each part costs, and nothing appears halfway through as an extra.
Where this work usually goes wrong
Ventilation is where most new roofs are quietly compromised. A breathable membrane is not a substitute for eaves and ridge ventilation on every build-up, and sealing a roof tight without a path for moisture is how you get condensation dripping onto new insulation. We specify the ventilation as deliberately as we specify the tile.
What moves the price. The three things that move a re-roof price are scaffold, the covering you choose, and what the strip reveals. We give you a fixed price for the first two and an honest, itemised range for the third, agreed with you before anyone touches it.
Gislingham at a glance
| Postcodes | IP23 |
|---|---|
| County | Suffolk |
| Planning | Mid Suffolk District Council |
| Emergency | 24 hours, 7 days |
Our own photographs
New Roofs work we have finished
Real Stormproof jobs. Across Suffolk, Norfolk and the Essex border.
24 hours, 7 days
24-hour emergency roofer in Gislingham
Active leak or storm damage right now? Gislingham and the wider IP23 lanes are roughly 35 minutes from the Ipswich base, inside the same-day survey area. On a storm night, rural access and unlit lanes mean we will give you a realistic time rather than an optimistic one.
Verified reviews
What 9.88/10 actually looks like
Reproduced word for word from the Checkatrade profile. Job type, area and date on every one, so you can check them.
“Within 3 days I had a new dry ridge system installed and a new tiled porch roof. I am very pleased with the work. The team were very professional, very friendly and explained how they planned to complete the work.”
“Responded quickly to my request, arrived to fix the problem early morning the day after my request. Dealt with it quickly and efficiently.”
Work booked through Checkatrade is backed by their £1,000 guarantee, T&Cs apply. See all 16 reviews.
How it works
Five steps, same every time
Whether it is one slipped tile or a full re-roof.
- CallQuick triage by phone, no jargon. Tom works out whether this is a same-day job or a survey.
- Free surveyWe attend, inspect and photograph the roof, including the parts you cannot see from the ground.
- Written quoteItemised, fixed and in writing. No upsell, no pressure, no day-rate surprises.
- The workBBA-certified materials, proper fixings, and the site left clean at the end of every day.
- AftercareWorkmanship guarantee in writing, plus the manufacturer warranty on the materials.
Also in Gislingham
The rest of what we do across IP23
- Roof Repairs in Gislingham
- Flat Roofing in Gislingham
- Emergency Roof Repairs in Gislingham
- Roofer in Gislingham
- Roofing Company in Gislingham
- Roofing in Gislingham: full coverage
We also cover new roofs in
Straight answers
New Roofs in Gislingham: common questions
Our cottage is Listed, what does that change?
The application and the materials. Listed Building Consent goes to Mid Suffolk District Council and is separate from planning permission, and it usually fixes the covering to a matched hand-made clay pantile with sound originals salvaged and relaid. It also rules out the quick options, so the programme is longer and the specification is settled before the scaffold is booked.
Will you come out this far for a domestic re-roof?
Yes. Gislingham and the IP23 lanes are about 35 minutes from Ipswich and inside the area we work, and a re-roof is a booked job with scaffold up for days, so the travel is planned in. The only thing rural access changes is delivery: we confirm lane width and unloading ground before the materials are ordered.
How long does a full re-roof take?
A typical semi-detached is four to seven working days once scaffold is up, weather permitting. Larger period properties with complex leadwork run longer, and we give you the programme in writing before we start.
What happens if it rains mid-job?
We only ever strip what we can make watertight the same day, and the roof is sheeted overnight. That is why we work in sections rather than stripping the whole roof on day one.
Free, no obligation
Get a straight answer on your roof in Gislingham
Tell us what is going on. Tom calls you back within 1 working hour, Mon to Sat with honest advice and a fixed written quote. If it is a five-minute fix he will tell you that too.
- Free survey with photographs of what we find
- Fixed written price, never a day rate
- No sales visit, no finance pitch, no pressure
Prefer to talk? 01473 200566 · 24-hour emergency line, seven days a week.
Get your free roofing quote
Two taps and a phone number. That is the whole form.
Tom calls you back himself. Not a call centre, not a sales rep. Usually within 1 working hour, Mon to Sat.
9.88/10